Projects & references

Completed sites

Water mains, irrigation systems and pump installations across Bulgaria.

Completed sites from our practice - water mains, special chambers and trenchless crossings across Bulgaria. The gallery is updated as new sites are delivered.

Pump connection reconstruction - Merichleri3

Pump connection reconstruction - Merichleri

Merichleri

Reconstruction of a pump connection in Merichleri - rebuilding the pipework manifold from PE pipes and fittings with shut-off valves around the pump. The site is in progress.

  • Reconstruction of the pump's pipework manifold
  • PE pipes, fittings and electrofusion joints
  • Shut-off valves around the pump
  • The site is in progress
Water mains for 9 sprinkler systems - Elit 20958

Water mains for 9 sprinkler systems - Elit 2095

Elit 2095

The start (9 September) of our most ambitious project of the year - water mains for 9 sprinkler irrigation systems for Elit 2095, with PE pipes from DN125 to DN400. In the first 10 working days, 3695 m of mains have been laid. The project is in progress.

  • Water mains for 9 sprinkler irrigation systems
  • DN400 PN10 - 2408 m
  • DN400 PN6 - 800 m
  • DN315 PN10 - 1949 m
  • DN250 PN10 - 284 m
  • DN200 PN10 - 3051 m
  • DN160 PN10 - 594 m
  • DN125 PN10 - 594 m
3300 m Ø250 irrigation main with hydrants - Dimchevo10

3300 m Ø250 irrigation main with hydrants - Dimchevo

Dimchevo

Construction of a new irrigation main at Dimchevo with a water intake from a reservoir (the Mandra reservoir) - 3300 m of Ø250 HDPE pipe with 27 hydrants for hose-reel irrigation machines, 10 air-valve shafts and 10 drain (washout) shafts. The site is complete.

  • Irrigation main from Ø250 HDPE pipe - 3300 m
  • 27 hydrants for hose-reel machines
  • 10 air-valve shafts
  • 10 drain (washout) shafts
  • Water intake from a reservoir (Mandra)
Tying Valley pivots into the main - Katrig ET7

Tying Valley pivots into the main - Katrig ET

Katrig ET

Connecting Valley centre-pivot machines to the supply main for Katrig ET - foundation, riser with shut-off valves and the tie-in to the main. The pivots are ready to irrigate as soon as the pump arrives.

  • Tying Valley centre pivots into the main
  • Tie-in at the pivot centre with shut-off valves
  • Electrofusion and butt welding of the joints
  • Ready to irrigate once the pump arrives
Another supply main - Agro MM2

Another supply main - Agro MM

Agro MM

A new supply main from HDPE pipes for Agro MM - delivery of the pipes, butt welding and laying across the fields. The site is in progress.

  • Supply main from HDPE pipes
  • Delivery of the pipes on site
  • Butt welding and laying of the main
  • The site is in progress
Laying a water main - Malo Konare2

Laying a water main - Malo Konare

Malo Konare

Construction of a new water main near Malo Konare - butt-welded HDPE strings, trench excavation and laying the main across the fields. The site is in progress.

  • Butt welding of HDPE pipes into long strings
  • Trench excavation for the main
  • Laying the main across the fields
  • The site is in progress
Ø280 main for two systems - Agro MM5

Ø280 main for two systems - Agro MM

Agro MM

A new supply main for Agro MM feeding two irrigation systems - 1280 m of Ø280 HDPE pipe, butt-welded and laid in 4 days. The water is taken from an irrigation canal via a reinforced-concrete intake structure.

  • Supply main from Ø280 HDPE pipe
  • Total length 1280 m
  • Feeds two irrigation systems
  • Completed in 4 days
  • Reinforced-concrete water intake from an irrigation canal
New Ø315 main - Agro MM3

New Ø315 main - Agro MM

Agro MM

Construction of a new supply main for Agro MM - 864 m of Ø315 HDPE pipe, butt-welded and laid in two and a half days. The first of four fields in the project.

  • Supply main from Ø315 HDPE pipe
  • Total length 864 m
  • Butt welding and laying of the main
  • Completed in two and a half days
  • First of four fields in the project
Laying a water main - Konyovo13

Laying a water main - Konyovo

Konyovo

Construction of a new water main near Konyovo - butt-welded HDPE strings, trench excavation and laying the main across the fields. The site is in progress.

  • Butt welding of HDPE pipes into long strings
  • Trench excavation for the main
  • Laying the main across the fields
  • Electrofusion welding of fittings and flanged joints
  • The site is in progress
Water main, pivots & pump station - Elit 2095, Popovitsa14

Water main, pivots & pump station - Elit 2095, Popovitsa

Popovitsa

Elit 2095

Construction of a new water main for Elit 2095 in Popovitsa. The linear section: butt-welded and laid HDPE mains - Ø280 - 645 m, Ø160 - 370 m and Ø125 - 708 m, delivered in 5 days. Centre pivots are connected to the main and a pump station with Grundfos pumps and a reservoir has been built. The system is ready to irrigate.

  • Water main from HDPE pipes, butt welding
  • Ø280 - 645 m
  • Ø160 - 370 m
  • Ø125 - 708 m
  • Linear section completed in 5 days
  • Connection of centre pivots to the main
  • Pump station with Grundfos pumps and a reservoir
Start of a new Ø355 supply main7

Start of a new Ø355 supply main

Start of a new supply main from Ø355 HDPE pipes - delivery of the pipes, butt welding into long strings and pulling/laying across the fields. The site started before Christmas and is in progress.

  • Supply main from Ø355 HDPE pipes
  • Butt welding of the pipes into long strings
  • Pulling and laying the main across the fields
  • The site is in progress
New supply main - Enfo Agro OOD7

New supply main - Enfo Agro OOD

Enfo Agro OOD

Preparation and laying of a new supply main for Enfo Agro OOD - delivery of HDPE pipes, butt welding into long strings and laying the main across the farmland. The site is in progress.

  • Delivery of HDPE pipes for the supply main
  • Butt welding of the pipes into long strings
  • Laying the main across the farmland
  • Preparation for connecting the irrigation system
Supply main from a reservoir & centre-pivot system - Ravna gora13

Supply main from a reservoir & centre-pivot system - Ravna gora

Ravna gora

Construction of a supply main with a water intake from a reservoir, feeding a centre-pivot irrigation system - butt welding and laying of HDPE pipes, pulling the main through the fields, supply of pumps and a diesel generator, and installing the pivot with shut-off valves. The site is complete.

  • Water intake from a reservoir and supply main
  • Butt welding and laying of HDPE pipes
  • Pulling the main through the fields
  • Supply of pumps and a diesel generator for the pump station
  • Pivot centre installation with shut-off valves
Water main for hose-reel irrigators - Bozduganovo10

Water main for hose-reel irrigators - Bozduganovo

Bozduganovo

Construction of a water main feeding hose-reel irrigation machines for farmland - laying HDPE pipes with branch connections and nodes.

  • Water main for hose-reel irrigation machines
  • HDPE pipe laying with butt and electrofusion welding
  • Branch connections and nodes for the irrigators
  • Farmland, Bozduganovo
Installation of a Ø500 outlet pipe - Debar dam6

Installation of a Ø500 outlet pipe - Debar dam

Debar dam, Parvomay area

Installation of a Ø500 outlet (discharge) pipe at the Debar dam - pipe laying with flanged connections, a shut-off valve and an air valve.

  • Installation of a Ø500 outlet pipe
  • Flanged connections and shut-off valve
  • Air valve installation
  • Site: Debar dam, Parvomay area
Drip irrigation for 1,000 dka of orchards - Bulgarevo8

Drip irrigation for 1,000 dka of orchards - Bulgarevo

Bulgarevo

Construction of a drip irrigation system for orchards totalling 1,000 dka (decares) near Bulgarevo - supply mains, a water intake node and shut-off valve assemblies.

  • Drip irrigation system for orchards
  • Irrigated area: 1,000 dka
  • Supply mains with fittings and shut-off valves
  • Water intake node and valve assemblies
Pump installation at the pivot - LenovoStage 64

Pump installation at the pivot - Lenovo

Lenovo

Enfo Agro OOD, Lenovo

Installation of a pump at the pivot centre - connection to an HDPE manifold with shut-off valves and flanged joints, with electrofusion welding of the pipes.

  • Pump installation at the pivot centre
  • Connection to an HDPE manifold
  • Shut-off valves and flanged joints
  • Electrofusion welding of the pipes
Irrigation system in operation - LenovoStage 510

Irrigation system in operation - Lenovo

Lenovo

Enfo Agro OOD, Lenovo

The completed irrigation system is in full operation - the centre-pivot machines are watering the maize fields, the pump station is running and the water intake feeds the mains. The result of every stage of the site.

  • Centre-pivot machines in operation
  • Running pump station with a frequency converter
  • Water intake feeding the mains
  • Irrigation of the maize fields
Tap-in from Ø400 asbestos-cement pipes & joining the mains - LenovoStage 43

Tap-in from Ø400 asbestos-cement pipes & joining the mains - Lenovo

Lenovo

Enfo Agro OOD, Lenovo

A branch from two Ø400 asbestos-cement (eternit) pipes and joining of the two mains to feed drip irrigation. The system is ready for the pivots in the autumn.

  • Branch (tap-in) from two Ø400 asbestos-cement pipes
  • Joining of the two mains into a common manifold
  • Installation of shut-off valves
  • Preparation for drip irrigation supply
Pivot assembly & start-up - LenovoStage 314

Pivot assembly & start-up - Lenovo

Lenovo

Enfo Agro OOD, Lenovo

Assembly of centre-pivot irrigation machines on the completed foundations and commissioning. The site is complete.

  • Assembly of centre-pivot irrigation machines
  • Span assembly and connection to the supply main
  • Pump station with shut-off valves
  • Commissioning - the pivots are irrigating
Pivot foundations - LenovoStage 27

Pivot foundations - Lenovo

Lenovo

Enfo Agro OOD, Lenovo

Construction of reinforced-concrete foundations for centre-pivot irrigation systems - excavation, formwork, reinforcement and concreting.

  • Reinforced-concrete foundations for pivots
  • Excavation, formwork and reinforcement
  • Concreting of the foundations
  • For centre-pivot irrigation systems
DN250/DN160 supply main & pump station - Lenovo3

DN250/DN160 supply main & pump station - Lenovo

Lenovo

Enfo Agro OOD, Lenovo

Supply and installation of pipes, fittings and shut-off valves for a DN250/DN160 supply main with vertical branch connections for sprinkler and drip irrigation, together with the supply and commissioning of a 53 l/s pump with a frequency converter.

  • Supply and installation of pipes, fittings and shut-off valves
  • DN250 supply main - 420 m
  • DN160 supply main - 480 m
  • 2 vertical branch connections for sprinkler and drip irrigation
  • Supply and commissioning of a 53 l/s pump with a frequency converter
Supply main for sprinkler irrigation systems - DN225 / DN200 / DN1808

Supply main for sprinkler irrigation systems - DN225 / DN200 / DN180

Ekvator EOOD, Burgas

Supply and installation of pipes, fittings and shut-off valves to build a supply water main over 2.1 km long in three diameters, with vertical branch connections for sprinkler irrigation systems.

  • Supply and installation of pipes, fittings and shut-off valves
  • DN225 supply main - 996 m
  • DN200 supply main - 492 m
  • DN180 supply main - 696 m
  • 2 vertical branch connections for sprinkler irrigation systems
DN90 potable & fire-fighting water main - residential complex, Novi Han2

DN90 potable & fire-fighting water main - residential complex, Novi Han

Novi Han area

Gama Tech EOOD, Sofia

Construction of a DN90 potable and fire-fighting water main, 2,585 m long, for a new residential complex of 86 single-family houses, together with 86 service connections, shut-off valves, water-meter chambers and fire hydrants.

  • DN90 potable & fire-fighting water main - 2,585 m
  • 86 DN25 house service connections
  • Installation of shut-off valves and water-meter chambers
  • 7 fire hydrants
  • Serving a complex of 86 single-family houses
Floating water intake & pump start-up - SpasovoStage 48

Floating water intake & pump start-up - Spasovo

Spasovo

Dimo Dimov (registered farmer)

Construction of a floating reservoir intake and commissioning of the pumping system. The site is complete - the client is now irrigating.

  • Floating pontoon intake from the reservoir
  • Suction line to the pump station
  • HDPE butt welding and shut-off valve installation
  • Commissioning - the system is irrigating
Pump relocation - SpasovoStage 34

Pump relocation - Spasovo

Spasovo

Dimo Dimov (registered farmer)

Relocation of the pumping installation to a new position at the water source - dismantling, building a new suction line with shut-off valves and recommissioning.

  • Relocation of the pump to a new position
  • New suction line at the water source
  • Installation of shut-off valves
  • Recommissioning
DN200 supply main, 1,720 m - SpasovoStage 26

DN200 supply main, 1,720 m - Spasovo

Spasovo

Dimo Dimov (registered farmer)

Supply of pipes, fittings and valves and construction of a DN200 supply water main, 1,720 m long, connecting to existing sprinkler irrigation systems.

  • Supply of pipes, fittings and valves
  • Construction of a DN200 supply main - 1,720 m
  • 3 vertical branch connections
  • Connection to existing sprinkler irrigation systems
DN200 supply main for a sprinkler irrigation system - SpasovoStage 17

DN200 supply main for a sprinkler irrigation system - Spasovo

Spasovo

Dimo Dimov (registered farmer)

Supply of HDPE pipes and construction of a DN200 supply water main, 1,200 m long, feeding a sprinkler irrigation system, together with inspection chambers and shut-off valves.

  • Supply of DN200 HDPE pipes
  • Construction of a DN200 supply main - 1,200 m
  • 3 inspection chambers
  • Installation of shut-off valves
Water mains & trenchless crossings - Elin Pelin - Kostenets railway section2

Water mains & trenchless crossings - Elin Pelin - Kostenets railway section

Mirovo, Ihtiman municipality

GP Group AD, Sofia

Relocation of an existing potable-water main and construction of a new fire-fighting pipeline for Tunnel No. 3, together with inspection and special chambers and two horizontal directional drillings for the trenchless crossing of the active Sofia - Burgas railway line.

  • Relocation of a DN160 potable-water main - 355 m
  • DN70 fire-fighting pipeline for Tunnel No. 3 - 411 m
  • 4 inspection chambers, 2 air-valve chambers, 1 water-meter chamber and 1 drain chamber
  • Installation of shut-off valves
  • 2 horizontal directional drillings DN300 and DN400 with casing pipes crossing the Sofia - Burgas railway line

Want a project like this?

Briefly describe the site - we'll come back with a quote within a business day.